Welcome to Anhui Tiankang mechanical and Electrical Equipment Co., Ltd!
    Chinese |English |Statement|0550-7989666、0550-7989999
14137918256397.jpg

power cable

Product introduction: power transmission and distr
  • Tel:0550-7989666、0550-7989999
  • Fax:0550-7989666
  • Mail:tkjd@tiankang.com
Description

Product Description:

 


Product introduction: power transmission and distribution system for electric power cables, the AC rated voltage 0.6/1KV PVC insulated power cable and 35KV and below XLPE power cables produced by our company meet the requirements of standard GB1276 and IEC60502 and IEC60840, and have formed a series of flame-retardant, fire-resistant, cold resistant and waterproof power cables. In the series of flame retardant products, the oxygen isolation technology has been successfully applied. 0.6/1KV PVC insulation and XLPE insulated flame-retardant power cables can reach category GB/T12666.5 in the "burning test method for bundled power cables", and the rated voltage 6/10KV and 8.7/15KV XLPE flame-retardant power cables can also achieve class a high flame retardant requirements and have a large margin. On the basis of high flame retardance of XLPE insulation, a low smoke halogen free flame retardant oxygen insulated power cable has been developed. Its low smoke halogen free performance is in line with the national standard GB/T17651.1.2 and GB/T17650.1.2. So the whole level of XLPE power cable of our company. The fire-resistant power cable produced by our company is 0.6/1KV copper core cable with rated voltage. It can also produce low smoke halogen-free fire-resistant power cable and high flame retardant oxygen insulated fire resistant power cable. Its fire resistance meets GB/T12666.6's "test method of wire and cable fire resistance". Therefore, the overall performance of fire-resistant series power cables is excellent and reliable. The water blocking performance of fireproof cable is in accordance with IEC502-2 regulations. Two. Cable type, name and use

Serial number

 

Model

 

Name

 

Scope of use

 

One

 

VV VLV
VY VLY

 

PVC insulated PVC / PE sheathed power cables

 

For laying indoors, tunnels and pipelines, cables can not bear mechanical external forces.

 

VV22 VLV22
VV23 VLV23

 

PVC insulated PVC / PE sheathed steel tape armored power cables

 

The soil can be directly buried in the indoor and tunnel, and the cable can bear the mechanical external force.

 

VV32 VLV32
VV33 VLV33
VV42 VLV42
VV43 VLV43

 

PVC insulated PVC / PE sheathed steel wire armored power cables

 

In the high drop area, the cable can bear mechanical external force and considerable pulling force.

 

Two

 

YJV YJLV
YJY YJLY

 

XLPE insulated PVC / PE sheathed steel tape armored power cable

 

In the indoor, tunnel and pipeline, the cable can not bear the mechanical external force.

 

YJV22 YJLV22
YJV23 YJLV23

 

XLPE insulated PVC / PE sheathed steel tape armored power cable

 

The soil can be directly buried in the indoor and tunnel, and the cable can bear the mechanical external force.

 

YJV32 YJLV32
YJV33 YJLV33
YJV42 YJLV42
YJV43 YJLV43

 

XLPE insulated PVC / PE sheathed steel wire armored power cable

 

In the high drop area, the cable can bear mechanical external force and considerable pulling force.

 

Note: ZR- flame retardant G- oxygen barrier NH- refractory.

 

Precautions, operational characteristics and operation conditions of power cable installation

 


1, power cable installation matters needing attention

 


When the cables are installed parallel to the heat pipes, the distance between 2m should be maintained, and 0.5m should be maintained when crossing.

When the cable is parallel or cross installed with other pipelines, 0.5m distance should be maintained.

The buried depth of 1-35KV cable is not less than 0.7m when the cable is buried directly.

When 10KV and below cables are installed in parallel, the distance between each other is not less than 0.1M, 10-35KV is not less than 0.25m, and the distance between cross installation is not less than 0.5m.

The laying temperature of the cable is not less than 0 degrees, the bending radius is more than 15 (D+d), the single core cable is more than 20 (D+d), (D is the outer diameter of the cable, D is the outer diameter of the conductor).

6KV and above cable connector:

(1) when installing the cable terminal, the semiconductor shielding layer must be stripped. The insulation should not be damaged during operation. The scratch should be avoided. If necessary, sandpaper will be used to smooth the shield. The shielding ends should be smoothed and Shi Moceng carbon particles should be removed.

2. The copper strip shield and steel armour of plastic insulated cable terminal must be grounded properly, and the principle of short circuit is also followed. It avoids the induced electromotive force at the end of the steel armor, and even the "fire" and the combustion jacket. The grounding lead wire requires me to use tin plated braided copper wire and ferrochrome tin soldering when connecting with the cable copper belt. It is not suitable to use the torch to seal the weld so as to avoid burning the insulation.

3. The three phase copper shield should be connected to the ground wire respectively. Attention should be given to shielding grounding wire and steel armored ground wire to separate each other and to insulate each other. The location of welding ground wire should be as low as possible.

The basic requirements for cable ends and intermediate joints are as follows: A. conductor connection; B. insulation is reliable; radiation crosslinking heat shrinkable silicone rubber insulation material is recommended; C. is well sealed; D. has enough mechanical strength to adapt to various operating conditions.

The ends of cables must be protected from erosion by water and other corrosive materials, so as to prevent breakdown due to the ageing of insulation caused by water trees.

Cable handling must be carried out with crane or fork lift truck. It is prohibited to be transported flat or flat. Large cable should be installed with cable car to avoid damage to cable or abrasion due to manual dragging.

If the cable cannot be laid in time for any reason, it should be stored in dry place to prevent the sun from drying up and the water intake at the end of the cable.

Attention: the installation of cable or cable should be familiar with the installation personnel or full-time technical personnel who are familiar with the performance of wire and cable. If there is still something unclear, please consult with the relevant technical department or the technical department of our factory.


Browse:
Return To The Top

分享到: